Assessment Year | 2007 |
---|---|
Principal Product | Coated Food Packaging |
NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
Sales Range | $50 M to 100M |
# of Employees | 215 |
Plant Area |
228,600
ft2
|
Annual Production | 250,000
lb
|
Production Hrs. Annual | 8,700
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $851,821 | 16,936,282 |
kWh
|
$0.050 |
Electricity Demand | $79,037 | 29,602 |
kW-mo/yr
|
$2.67 |
Electricity Fees | $35,590 | - |
|
- |
Natural Gas | $614,541 | 65,095 |
MMBtu
|
$9.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $405,620 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,500 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,300 | - | - | - |
$1,300
-
MMBtu
|
- | |
02 | 2.1113: Reduce combustion air flow to optimum | $135,120 | $4,350 |
$920
18
kWh
|
- |
$134,200
-
MMBtu
|
- | |
03 | 2.2621: Modify refrigeration system to operate at a lower pressure | $3,900 | $500 |
$3,400
68,900
kWh
|
$500
-
kW-mo/yr
|
- | - | |
04 | 2.2623: Minimize condenser cooling water temperature | $4,400 | $1,000 |
$4,400
88,600
kWh
|
- | - | - | |
05 | 4.625: Develop standard operating procedures | $204,000 | $18,800 | - | - | - | $204,000 | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $500 | $7,700 | - |
$500
-
kW-mo/yr
|
- | - | |
07 | 2.4224: Upgrade controls on compressors | $16,800 | $11,500 |
$15,600
316,900
kWh
|
$1,200
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $34,700 | - |
$32,000
648,800
kWh
|
$2,700
-
kW-mo/yr
|
- | - | |
09 | 2.7261: Install timers and/or thermostats | $4,900 | $7,400 |
$4,900
99,400
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $405,620 | $51,250 |
$61,220
1,222,618
kWh
|
$4,900
-
kW-mo/yr
|
$135,500
-
MMBtu
|
$204,000 | ||
TOTAL IMPLEMENTED | $36,500 | $7,700 |
$32,000
648,800
kWh
|
$3,200
-
kW-mo/yr
|
$1,300
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs