ITAC Assessment: OR0514
ITAC logo
ITAC Assessment: OR0514
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Coated Food Packaging
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $50
M
to 100
M
# of Employees 215
Plant Area 228,600
ft2
Annual Production 250,000
lb
Production Hrs. Annual 8,700
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $851,821 16,936,282
kWh
Electricity Demand $79,037 29,602
kW-mo/yr
Electricity Fees $35,590 -
Natural Gas $614,541 65,095
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $405,620 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,300 - - - $1,300
-
MMBtu
-
02 2.1113: Reduce combustion air flow to optimum $135,120 $4,350 $920
18
kWh
- $134,200
-
MMBtu
-
03 2.2621: Modify refrigeration system to operate at a lower pressure $3,900 $500 $3,400
68,900
kWh
$500
-
kW-mo/yr
- -
04 2.2623: Minimize condenser cooling water temperature $4,400 $1,000 $4,400
88,600
kWh
- - -
05 4.625: Develop standard operating procedures $204,000 $18,800 - - - $204,000
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $500 $7,700 - $500
-
kW-mo/yr
- -
07 2.4224: Upgrade controls on compressors $16,800 $11,500 $15,600
316,900
kWh
$1,200
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $34,700 - $32,000
648,800
kWh
$2,700
-
kW-mo/yr
- -
09 2.7261: Install timers and/or thermostats $4,900 $7,400 $4,900
99,400
kWh
- - -
TOTAL RECOMMENDED $405,620 $51,250 $61,220
1,222,618
kWh
$4,900
-
kW-mo/yr
$135,500
-
MMBtu
$204,000
TOTAL IMPLEMENTED $36,500 $7,700 $32,000
648,800
kWh
$3,200
-
kW-mo/yr
$1,300
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs