ITAC Assessment: MS0249
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product pvc pipe
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 83
Plant Area 105,000
ft2
Annual Production 120,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $625,077 18,387,900
kWh
Electricity Demand $291,181 31,610
kW-mo/yr
Electricity Fees $26,427 -
Natural Gas $17,261 1,944
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $109,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $80,970

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Consumption Savings
01 2.3212: Optimize plant power factor $54,067 $26,100 - - $54,067 - -
02 3.4154: Eliminate leaks in water lines and valves $19,536 $250 - - - - $19,536
-
Tgal
03 2.2437: Recover waste heat from equipment $12,086 $1,814 - - - $12,086
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,838 $14,639 $5,850
163,076
kWh
$2,858
-
kW-mo/yr
$130 - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,879 $708 $6,778
188,961
kWh
- $101 - -
06 2.4221: Install compressor air intakes in coolest locations $2,388 $358 $1,424
39,700
kWh
$928
-
kW-mo/yr
$36 - -
07 2.3132: Recharge batteries on during off-peak demand periods $2,064 - - $2,034
-
kW-mo/yr
$30 - -
08 2.7261: Install timers and/or thermostats $1,547 $827 $1,524
42,482
kWh
- $23 - -
09 2.8112: Combine utility meters $1,077 - - - $1,077 - -
10 2.7135: Install occupancy sensors $949 $519 $903
17,755
kWh
- $46 - -
11 2.4133: Use most efficient type of electric motors $488 $820 $481
13,414
kWh
- $7 - -
TOTAL RECOMMENDED $109,919 $46,035 $16,960
465,388
kWh
$5,820
-
kW-mo/yr
$55,517 $12,086
-
MMBtu
$19,536
-
Tgal
TOTAL IMPLEMENTED $80,970 $27,878 $7,259
202,375
kWh
- $54,175 - $19,536
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs