ITAC Assessment: LS2213
ITAC logo
ITAC Assessment: LS2213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product HVAC equipment
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 86
Plant Area 63,000
ft2
Annual Production 200
units
Production Hrs. Annual 2,730
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,998 508,506
kWh
Electricity Demand $12,248 2,543
kW-mo/yr
Natural Gas $9,435 1,191
MMBtu
Fuel Oil #2 $10,000 417
MMBtu
Other Gas $15,000 441
MMBtu
TOTAL YEARLY COSTS $102,681
RECOMMENDED SAVINGS* $40,021 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,021

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7124: Make a practice of turning off lights when not needed $390 - $390
3,538
kWh
-
02 2.7261: Install timers and/or thermostats $704 $38 $704
6,397
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,162 $360 $5,162
46,876
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $32,208 $7,144 $28,385
257,756
kWh
$3,823
-
kW-mo/yr
05 2.7134: Use photocell controls $1,557 $370 $1,557
14,139
kWh
-
TOTAL RECOMMENDED $40,021 $7,912 $36,198
328,706
kWh
$3,823
-
kW-mo/yr
TOTAL IMPLEMENTED $40,021 $7,912 $36,198
328,706
kWh
$3,823
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs