ITAC Assessment: CI0019
ITAC logo
ITAC Assessment: CI0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Aircraft Parts Maintenance
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 43
Plant Area 18,000
ft2
Annual Production 8,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,397 429,858
kWh
Electricity Demand $19,797 3,496
kW-mo/yr
Electricity Fees $11,610 -
Natural Gas $4,285 147
MMBtu
Waste Disposal Costs
Water Usage $12,359 1,252
Tgal
Water Disposal $9,075 1,252
Tgal
TOTAL YEARLY COSTS $124,523
RECOMMENDED SAVINGS* $135,971 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Personnel Changes Savings
01 2.9114: Use solar heat to make electricty $70,514 $548,740 $66,235
422,415
kWh
$4,279
-
kW-mo/yr
- -
02 2.7447: Install vinyl strip / high speed / air curtain doors $42,450 $24,000 $11,250
71,744
kWh
- - $31,200
03 2.6231: Utilize controls to operate equipment only when needed $10,792 $2,500 $10,792
68,826
kWh
- - -
04 2.7491: Insulate glazing, walls, ceilings, and roofs $6,992 $8,890 $6,992
44,591
kWh
- - -
05 2.1321: Replace fossil fuel equipment with electrical equipment $1,769 $3,500 $1,769
11,283
kWh
- - -
06 2.6212: Turn off equipment during breaks, reduce operating time $1,444 $200 $1,444
9,210
kWh
- - -
07 2.4322: Use or replace with energy efficient substitutes $1,159 $1,500 - - $1,159
-
Tgal
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $851 $1,500 $776
4,951
kWh
$75
-
kW-mo/yr
- -
TOTAL RECOMMENDED $135,971 $590,830 $99,258
633,020
kWh
$4,354
-
kW-mo/yr
$1,159
-
Tgal
$31,200
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs