Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Acrylic Sheets
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 70,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $374,169 5,210,434
kWh
Natural Gas $709,420 142,221
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,523 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,993

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,552 $6,151 $4,552
63,306
kWh
-
02 2.4133: Use most efficient type of electric motors $1,441 $1,363 $1,441
19,930
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $2,318 $1,000 $2,318
32,239
kWh
-
04 2.1232: Keep boiler tubes clean $31,212 $2,500 - $31,212
-
MMBtu
TOTAL RECOMMENDED $39,523 $11,014 $8,311
115,475
kWh
$31,212
-
MMBtu
TOTAL IMPLEMENTED $5,993 $7,514 $5,993
83,236
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs