ITAC Assessment: OR0512
ITAC logo
ITAC Assessment: OR0512
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Air Craft Flooring, Air Craft Ducting
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 340
Plant Area 380,000
ft2
Annual Production 630,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $508,833 12,111,652
kWh
Electricity Demand $96,957 399,468
kW-mo/yr
Natural Gas $303,925 40,574
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $151,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $118,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $100,600 $5,500 $50,400
1,320,000
kWh
- $50,200
-
MMBtu
02 2.1113: Reduce combustion air flow to optimum $32,700 $20,600 - - $32,700
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $7,000 $5,000 - - $7,000
-
MMBtu
04 2.2437: Recover waste heat from equipment $6,300 $5,000 - - $6,300
-
MMBtu
05 2.4224: Upgrade controls on compressors $4,400 $7,500 $4,050
101,000
kWh
$350
-
kW-mo/yr
-
TOTAL RECOMMENDED $151,000 $43,600 $54,450
1,421,000
kWh
$350
-
kW-mo/yr
$96,200
-
MMBtu
TOTAL IMPLEMENTED $118,300 $23,000 $54,450
1,421,000
kWh
$350
-
kW-mo/yr
$63,500
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs