ITAC Assessment: UD0737
ITAC logo
ITAC Assessment: UD0737
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Emergency Medical Vehicles
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3713: Truck and Bus Bodies
Sales Range $50
M
to 100
M
# of Employees 372
Plant Area 102,000
ft2
Annual Production 471
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,030 2,435,792
kWh
Electricity Demand $71,030 4,548
kW-mo/yr
Natural Gas $249,097 23,909
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $492,225 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $450,238

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 3.1161: Eliminate/reduce an operation $448,000 $(-70,000.0) - - - $548,000 - $(-100,000.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,868 $3,600 - - $10,868
-
MMBtu
- - -
03 2.7221: Lower temperature during the winter season and vice-versa $9,201 - - - $9,201
-
MMBtu
- - -
04 2.4224: Upgrade controls on compressors $7,933 $1,436 $4,526
151,200
kWh
$3,407
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,592 $15,876 $2,915
40,484
kWh
$682
-
kW-mo/yr
- - $(-5.0) -
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,404 - $1,944
64,800
kWh
$1,460
-
kW-mo/yr
- - - -
07 2.4237: Substitute compressed air cooling with water or air cooling $3,177 $387 $1,814
60,480
kWh
$1,363
-
kW-mo/yr
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,238 $6,552 $1,337
44,554
kWh
$1,004
-
kW-mo/yr
- $(-103.0) - -
09 2.1233: Analyze flue gas for proper air/fuel ratio $2,074 - - - $2,074
-
MMBtu
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,120 - $1,120
15,552
kWh
- - - - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $419 $1,968 $419
7,975
kWh
- - - - -
12 2.4111: Utilize energy-efficient belts and other improved mechanisms $199 - $69
2,304
kWh
$130
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $492,225 $(-40,181.0) $14,144
387,349
kWh
$8,046
-
kW-mo/yr
$22,143
-
MMBtu
$547,897 $(-5.0) $(-100,000.0)
TOTAL IMPLEMENTED $450,238 $(-63,448.0) $1,337
44,554
kWh
$1,004
-
kW-mo/yr
- $547,897 - $(-100,000.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs