ITAC Assessment: OR0481
ITAC logo
ITAC Assessment: OR0481
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Potato and corn chips
NAICS 311919: Other Snack Food Manufacturing
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 300,000
ft2
Annual Production 18,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $715,158 17,008,350
kWh
Electricity Demand $181,519 390,348
kW-mo/yr
Electricity Fees $2,088 -
Natural Gas $1,000,000 357,286
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,670 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.4224: Upgrade controls on compressors $32,471 - $27,022
643,131
kWh
$5,449
-
kW-mo/yr
- -
02 2.6232: Install set-back timers $2,880 $300 $2,880
72,000
kWh
- - -
03 4.111: Add equipment/ operators to reduce production bottleneck $25,000 $26,000 - - - $25,000
04 2.3212: Optimize plant power factor $7,319 $8,000 - - $7,319 -
TOTAL RECOMMENDED $67,670 $34,300 $29,902
715,131
kWh
$5,449
-
kW-mo/yr
$7,319 $25,000
TOTAL IMPLEMENTED $25,000 $26,000 - - - $25,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs