ITAC Assessment: OR0069
ITAC logo
ITAC Assessment: OR0069
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product DOOR SASHES
NAICS
n/a
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 56
Plant Area
n/a
Annual Production 7,200
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,442 3,406,213
kWh
Fuel Oil #6 $94,398 30,370
MMBtu
Wood $18,568 38,730
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,162 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,162

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Wood Savings Administrative Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $1,137 - $1,137
30,774
kWh
- - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $9,222 $500 - $8,224
-
MMBtu
$998
-
MMBtu
-
03 2.6232: Install set-back timers $725 $100 $725
19,637
kWh
- - -
04 2.4133: Use most efficient type of electric motors $59 $45 $59
1,172
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,854 $3,938 $1,909
39,859
kWh
- - $945
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $952 $300 $952
19,930
kWh
- - -
07 2.4221: Install compressor air intakes in coolest locations $108 $200 $108
2,345
kWh
- - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,105 $55,093 $20,105
543,962
kWh
- - -
TOTAL RECOMMENDED $35,162 $60,176 $24,995
657,679
kWh
$8,224
-
MMBtu
$998
-
MMBtu
$945
TOTAL IMPLEMENTED $35,162 $60,176 $24,995
657,679
kWh
$8,224
-
MMBtu
$998
-
MMBtu
$945
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs