ITAC Assessment: OR0016
ITAC logo
ITAC Assessment: OR0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product LOG FORKS, CANOPIES, ETC
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 160
Plant Area
n/a
Annual Production 5,500,000
lb
Production Hrs. Annual 1,990
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,323 1,288,980
kWh
Natural Gas $16,787 3,558
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,143 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,171

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $1,173 - $1,173
20,223
kWh
-
02 2.6232: Install set-back timers $4,547 $270 $3,607
62,134
kWh
$940
03 2.6212: Turn off equipment during breaks, reduce operating time $2,304 $200 $2,304
39,859
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $147 $200 $147
2,638
kWh
-
05 2.3212: Optimize plant power factor $1,972 $4,110 $1,972
-
kWh
-
TOTAL RECOMMENDED $10,143 $4,780 $9,203
124,854
kWh
$940
TOTAL IMPLEMENTED $8,171 $670 $7,231
124,854
kWh
$940
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs