ITAC Assessment: OR0008
ITAC logo
ITAC Assessment: OR0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product LUMBER
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area
n/a
Annual Production 12,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,393 1,029,308
kWh
Wood $65,700 150,672
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,708 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,442

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $551 - $551
10,551
kWh
-
02 2.6232: Install set-back timers $2,187 $100 $2,187
41,911
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $729 $80 $729
14,068
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $334 $100 $334
6,448
kWh
-
05 2.1131: Repair faulty insulation in furnaces, boilers, etc $1,408 $705 - $1,408
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,949 $1,000 $1,949
37,515
kWh
-
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $882 $609 - $882
-
MMBtu
08 2.4133: Use most efficient type of electric motors $159 $128 $159
2,931
kWh
-
09 2.4131: Size electric motors for peak operating efficiency $6,901 $6,627 $6,901
150,059
kWh
-
10 2.2511: Insulate bare equipment $2,608 $2,691 - $2,608
-
MMBtu
TOTAL RECOMMENDED $17,708 $12,040 $12,810
263,483
kWh
$4,898
-
MMBtu
TOTAL IMPLEMENTED $5,442 $3,791 $2,834
54,514
kWh
$2,608
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs