Assessment Year | 1987 |
---|---|
Principal Product | LUMBER |
NAICS |
n/a
|
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $5 M to 10M |
# of Employees | 60 |
Plant Area |
n/a
|
Annual Production | 12,000
thousand feet
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $53,393 | 1,029,308 |
kWh
|
$0.052 |
Wood | $65,700 | 150,672 |
MMBtu
|
$0.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,708 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,442 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Wood Savings |
---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $551 | - |
$551
10,551
kWh
|
- | |
02 | 2.6232: Install set-back timers | $2,187 | $100 |
$2,187
41,911
kWh
|
- | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $729 | $80 |
$729
14,068
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $334 | $100 |
$334
6,448
kWh
|
- | |
05 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $1,408 | $705 | - |
$1,408
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,949 | $1,000 |
$1,949
37,515
kWh
|
- | |
07 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $882 | $609 | - |
$882
-
MMBtu
|
|
08 | 2.4133: Use most efficient type of electric motors | $159 | $128 |
$159
2,931
kWh
|
- | |
09 | 2.4131: Size electric motors for peak operating efficiency | $6,901 | $6,627 |
$6,901
150,059
kWh
|
- | |
10 | 2.2511: Insulate bare equipment | $2,608 | $2,691 | - |
$2,608
-
MMBtu
|
|
TOTAL RECOMMENDED | $17,708 | $12,040 |
$12,810
263,483
kWh
|
$4,898
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,442 | $3,791 |
$2,834
54,514
kWh
|
$2,608
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs