ITAC Assessment: IC0160
ITAC logo
ITAC Assessment: IC0160
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Protective Packaging systems
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 359
Plant Area 278,500
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,750,765 28,823,233
kWh
Electricity Demand $287,059 52,924
kW-mo/yr
Natural Gas $904,599 95,827
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $107,408 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $88,731

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,507 $33,261 $10,646
174,526
kWh
$1,296
-
kW-mo/yr
- $528 $2,037
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,924 $17,420 $5,036
82,588
kWh
$731
-
kW-mo/yr
- $(-178.0) $1,335
03 2.7142: Utilize higher efficiency lamps and/or ballasts $292 $653 $478
7,828
kWh
$60
-
kW-mo/yr
- $69 $(-315.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $13,109 $51,610 $7,850
128,684
kWh
$954
-
kW-mo/yr
- $4,343 $(-38.0)
05 2.4133: Use most efficient type of electric motors $42,819 $131,206 $37,480
614,431
kWh
$5,339
-
kW-mo/yr
- - -
06 2.4133: Use most efficient type of electric motors $17,221 $42,838 $8,082
132,506
kWh
$9,139
-
kW-mo/yr
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,043 $345 $6,043
99,071
kWh
- - - -
08 2.2135: Repair and eliminate steam leaks $746 $58 - - $746
-
MMBtu
- -
09 2.2163: Use minimum steam operating pressure $340 - - - $340
-
MMBtu
- -
10 2.1233: Analyze flue gas for proper air/fuel ratio $179 - - - $179
-
MMBtu
- -
11 2.4224: Upgrade controls on compressors $4,813 - $2,992
49,056
kWh
$1,821
-
kW-mo/yr
- - -
12 2.6211: Conserve energy by efficient use of vending machines $415 - $220
3,600
kWh
$195
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $107,408 $277,391 $78,827
1,292,290
kWh
$19,535
-
kW-mo/yr
$1,265
-
MMBtu
$4,762 $3,019
TOTAL IMPLEMENTED $88,731 $225,781 $67,765
1,110,950
kWh
$16,565
-
kW-mo/yr
$925
-
MMBtu
$419 $3,057
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs