Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Sausage and other prepared meat products
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $100
M
to 500
M
# of Employees 596
Plant Area 112,000
ft2
Annual Production 80,000,000
lb
Production Hrs. Annual 6,084
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,511,900 38,276,400
kWh
Electricity Demand $1,633,800 94,603
kW-mo/yr
Electricity Fees $94,749 -
Natural Gas $332,318 82,252
MMBtu
TOTAL YEARLY COSTS $3,572,767
RECOMMENDED SAVINGS* $510,592 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $164,531 - - - $164,531 -
02 2.3212: Optimize plant power factor $91,270 $50,570 - - $91,270 -
03 2.6231: Utilize controls to operate equipment only when needed $111,877 $100,000 $111,877
2,832,338
kWh
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $84,978 $73,560 $84,978
2,151,344
kWh
- - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $33,536 $500 - - - $33,536
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $19,990 - $19,990
506,065
kWh
- - -
07 2.4221: Install compressor air intakes in coolest locations $4,410 $1,270 $2,758
69,817
kWh
$1,652
-
kW-mo/yr
- -
TOTAL RECOMMENDED $510,592 $225,900 $219,603
5,559,564
kWh
$1,652
-
kW-mo/yr
$255,801 $33,536
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs