| Assessment Year | 2019 |
|---|---|
| Principal Product | Inorganic Chemicals |
| NAICS | 325180: Other Basic Inorganic Chemical Manufacturing |
| SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 48 |
| Plant Area |
1,740,000
ft2
|
| Annual Production | 992
ton
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $2,807,078 | 85,976,924 |
kWh
|
$0.033 | |
| Electricity Demand | $1,036,546 | 135,969 |
kW-mo/yr
|
$7.62 | |
| Other Gas | $196,459 | 17,797 |
MMBtu
|
$11.04 | |
| Waste Disposal Costs | |||||
| Water Usage | $79,479 | 12,742 |
Tgal
|
$6.24 | |
| TOTAL YEARLY COSTS | $4,119,562 | ||||
| RECOMMENDED SAVINGS* | $33,087 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $747 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $16,383 | $12,752 | - | - |
$16,383
-
MMBtu
|
|
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $15,577 | $17,500 | - | - |
$15,577
-
MMBtu
|
|
| 03 | 2.6232: Install set-back timers | $320 | $200 |
$320
9,682
kWh
|
- | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $380 | $435 |
$288
8,736
kWh
|
$92
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $427 | $2,045 |
$206
6,261
kWh
|
$221
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $33,087 | $32,932 |
$814
24,679
kWh
|
$313
-
kW-mo/yr
|
$31,960
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $747 | $2,245 |
$526
15,943
kWh
|
$221
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs