ITAC Assessment: OK0997
ITAC logo
ITAC Assessment: OK0997
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Carbonated beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 225
Plant Area 300,000
ft2
Annual Production 16,000,000
units
Production Hrs. Annual 7,488
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $348,273 5,994,717
kWh
Electricity Demand $109,528 17,080
kW-mo/yr
Electricity Fees $8,160 -
Natural Gas $368,285 51,009
MMBtu
TOTAL YEARLY COSTS $834,246
RECOMMENDED SAVINGS* $75,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,210

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $29,994 $49,087 $29,994
517,137
kWh
- - -
02 2.7261: Install timers and/or thermostats $17,569 $1,795 - - - $17,569
-
MMBtu
03 2.3212: Optimize plant power factor $6,052 $14,332 - - $6,052 -
04 2.2437: Recover waste heat from equipment $7,415 $2,668 - - - $7,415
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $5,238 - $5,238
90,305
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $2,715 $1,306 $2,306
39,761
kWh
$409
-
kW-mo/yr
- -
07 2.3132: Recharge batteries on during off-peak demand periods $4,032 - - $4,032
-
kW-mo/yr
- -
08 2.7224: Reduce space conditioning during non-working hours $1,875 - $958
16,521
kWh
- - $917
-
MMBtu
09 2.7241: Install outside air damper / economizer on hvac unit $663 $2,640 $663
11,437
kWh
- - -
10 2.7211: Clean and maintain refrigerant condensers and towers $366 $485 $231
3,990
kWh
$135
-
kW-mo/yr
- -
TOTAL RECOMMENDED $75,919 $72,313 $39,390
679,151
kWh
$4,576
-
kW-mo/yr
$6,052 $25,901
-
MMBtu
TOTAL IMPLEMENTED $39,210 $6,254 $8,733
150,577
kWh
$4,576
-
kW-mo/yr
- $25,901
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs