ITAC Assessment: UM0393
ITAC logo
ITAC Assessment: UM0393
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Engine Testing
NAICS 541380: Testing Laboratories
SIC 8734: Testing Laboratories
Sales Range $10
M
to 50
M
# of Employees 61
Plant Area 24,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $190,410 4,010,190
kWh
Electricity Demand $135,138 6,689
kW-mo/yr
Natural Gas $27,831 3,054
MMBtu
Other Energy $1,203,200 45,669
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $107,176 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,681

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,825 $18,696 $17,369
365,811
kWh
$8,456
-
kW-mo/yr
- -
02 2.4239: Eliminate or reduce compressed air usage $14,190 $18,432 $8,960
188,718
kWh
$5,230
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $12,125 $29,225 $7,654
161,201
kWh
$4,471
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $7,581 $2,500 $4,789
100,868
kWh
$2,792
-
kW-mo/yr
- -
05 2.4224: Upgrade controls on compressors $7,039 $6,006 $4,450
93,732
kWh
$2,589
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,888 $5,440 $2,481
52,259
kWh
$2,407
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $3,578 $200 $2,263
47,669
kWh
$1,315
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,408 $1,533 $2,154
45,363
kWh
$1,254
-
kW-mo/yr
- -
09 2.7135: Install occupancy sensors $1,916 $1,200 $1,916
40,357
kWh
- - -
10 2.2449: Recover heat from exhausted steam, hot air or hot water $10,545 $23,900 - - $10,545
-
MMBtu
-
11 2.2437: Recover waste heat from equipment $3,143 $2,500 - - $3,143
-
MMBtu
-
12 2.2511: Insulate bare equipment $12,938 $600 - - - $12,938
-
MMBtu
TOTAL RECOMMENDED $107,176 $110,232 $52,036
1,095,978
kWh
$28,514
-
kW-mo/yr
$13,688
-
MMBtu
$12,938
-
MMBtu
TOTAL IMPLEMENTED $68,681 $59,194 $36,363
765,859
kWh
$19,380
-
kW-mo/yr
- $12,938
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs