Assessment Year | 2021 |
---|---|
Principal Product | Treated Water |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $50 M to 100M |
# of Employees | 46 |
Plant Area |
290,000
ft2
|
Annual Production | 4,929,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $111,334 | 959,776 |
kWh
|
$0.12 |
Electricity Demand | $336,402 | 10,512 |
kW-mo/yr
|
$32.00 |
Natural Gas | $262,424 | 44,087 |
MMBtu
|
$5.95 |
Fuel Oil #1 | $128 | 5 |
MMBtu
|
$25.60 |
TOTAL YEARLY COSTS | $710,288 | |||
RECOMMENDED SAVINGS* | $1,079,155 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $74,027 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,530 | - |
$12
3,564
kWh
|
$2,518
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7224: Reduce space conditioning during non-working hours | $8,683 | $748 |
$8,683
74,854
kWh
|
- | - | - | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,060 | $149 |
$1,060
9,139
kWh
|
- | - | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $192,090 | $88,600 |
$131,859
1,136,717
kWh
|
$60,231
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $33,128 | $15,421 |
$33,128
285,589
kWh
|
- | - | - | - | - | |
06 | 2.3323: Install emissions controls to increase capacity | $352,407 | $278,000 |
$280,667
2,419,545
kWh
|
$71,740
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $24,296 | $18,341 |
$24,296
209,454
kWh
|
- | - | - | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $77,855 | $69,051 |
$77,855
671,169
kWh
|
- | - | - | - | - | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $78,185 | $114,380 |
$55,615
479,442
kWh
|
$22,570
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.3142: User battery storage for power quality issues | $262,606 | $452,925 | - |
$291,950
-
kW-mo/yr
|
$(-22,344.0)
-
MMBtu
|
$(-7,000.0)
-
MMBtu
|
- | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,256 | $50,039 |
$19,042
163,089
kWh
|
$5,393
-
kW-mo/yr
|
- | - | $1,279 | $542 | |
12 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,006 | $31,025 |
$9,006
77,635
kWh
|
- | - | - | - | - | |
13 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,053 | $65,832 |
$11,053
95,287
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $1,079,155 | $1,184,511 |
$652,276
5,625,484
kWh
|
$454,402
-
kW-mo/yr
|
$(-22,344.0)
-
MMBtu
|
$(-7,000.0)
-
MMBtu
|
$1,279 | $542 | ||
TOTAL IMPLEMENTED | $74,027 | $131,441 |
$64,295
556,668
kWh
|
$7,911
-
kW-mo/yr
|
- | - | $1,279 | $542 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs