Assessment Year | 2018 |
---|---|
Principal Product | Bathtubs |
NAICS | 326191: Plastics Plumbing Fixture Manufacturing |
SIC | 3088: Plastics Plumbing Fixtures |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
60,000
ft2
|
Annual Production | 20,500
units
|
Production Hrs. Annual | 2,184
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $66,833 | 964,920 |
kWh
|
$0.069 | |
Electricity Demand | $39,088 | 3,704 |
kW-mo/yr
|
$10.55 | |
Natural Gas | $33,894 | 4,689 |
MMBtu
|
$7.23 | |
Waste Disposal Costs | |||||
Water Usage | $7,923 | 1,175 |
Tgal
|
$6.74 | |
TOTAL YEARLY COSTS | $147,738 | ||||
RECOMMENDED SAVINGS* | $7,467 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $6,411 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $525 | $1,755 |
$525
7,604
kWh
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $171 | $1,243 |
$171
2,471
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $308 | $259 |
$181
2,621
kWh
|
$127
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $604 | $450 |
$604
8,757
kWh
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $208 | - |
$208
3,020
kWh
|
- | - | - | |
06 | 2.4226: Use / purchase optimum sized compressor | $2,701 | $15,796 |
$2,701
39,148
kWh
|
- | - | - | |
07 | 2.6232: Install set-back timers | $2,280 | $1,284 |
$797
11,543
kWh
|
- | - |
$1,483
-
MMBtu
|
|
08 | 2.8114: Change rate schedules or other changes in utility service | $360 | $45 | - | - | $360 | - | |
09 | 2.8123: Pay utility bills on time | $310 | - | - | - | $310 | - | |
TOTAL RECOMMENDED | $7,467 | $20,832 |
$5,187
75,164
kWh
|
$127
-
kW-mo/yr
|
$670 |
$1,483
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,411 | $17,789 |
$4,491
65,089
kWh
|
$127
-
kW-mo/yr
|
$310 |
$1,483
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs