ITAC Assessment: OK0964
ITAC logo
ITAC Assessment: OK0964
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Fiberglass pipe
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 195,000
ft2
Annual Production 778,072
units
Production Hrs. Annual 2,158
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,799 3,974,600
kWh
Electricity Demand $33,335 11,791
kW-mo/yr
Natural Gas $116,022 27,595
MMBtu
Waste Disposal Costs
Water Usage $6,670 571
Tgal
TOTAL YEARLY COSTS $331,826
RECOMMENDED SAVINGS* $46,533 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,682

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $10,155 - $10,155
230,814
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,164 $3,000 $6,164
140,107
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $246 $800 $246
5,604
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,682 $38,281 $4,380
99,564
kWh
$1,302
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $798 $4,528 $615
13,977
kWh
$183
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,333 $4,260 $1,333
30,307
kWh
- -
07 2.2414: Use waste heat from hot flue gases to preheat $4,216 $5,750 - - $4,216
-
MMBtu
08 2.1233: Analyze flue gas for proper air/fuel ratio $1,602 $7,700 - - $1,602
-
MMBtu
09 2.2135: Repair and eliminate steam leaks $8,883 $1,250 - - $8,883
-
MMBtu
10 2.2511: Insulate bare equipment $1,734 $2,072 - - $1,734
-
MMBtu
11 2.6232: Install set-back timers $5,720 $4,750 $608
13,830
kWh
- $5,112
-
MMBtu
TOTAL RECOMMENDED $46,533 $72,391 $23,501
534,203
kWh
$1,485
-
kW-mo/yr
$21,547
-
MMBtu
TOTAL IMPLEMENTED $5,682 $38,281 $4,380
99,564
kWh
$1,302
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs