| Assessment Year | 1992 |
|---|---|
| Principal Product | FIBERGLASS STORAGE TANKS |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 125 |
| Plant Area |
n/a
|
| Annual Production | 1,600
pieces
|
| Production Hrs. Annual | 4,862
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $163,234 | 1,820,047 |
kWh
|
$0.090 |
| Natural Gas | $863 | 116 |
MMBtu
|
$7.44 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $39,581 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $23,055 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $1,905 | $8,000 |
$1,905
21,102
kWh
|
- | - | |
| 02 | 2.6218: Turn off equipment when not in use | $18,199 | $250 |
$18,199
203,107
kWh
|
- | - | |
| 03 | 2.2444: Use hot process fluids to preheat incoming process fluids | $1,661 | $325 | - |
$1,661
-
MMBtu
|
- | |
| 04 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $34 | $13 | - |
$34
-
MMBtu
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,951 | $1,197 |
$3,282
36,635
kWh
|
- | $(-331.0) | |
| 06 | 2.7123: Keep lamps and reflectors clean | $3,582 | $6,400 |
$3,217
35,756
kWh
|
- | $365 | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,106 | $4,292 |
$814
9,086
kWh
|
- | $4,292 | |
| 08 | 2.7261: Install timers and/or thermostats | $6,143 | $700 |
$3,061
34,291
kWh
|
$3,082
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $39,581 | $21,177 |
$30,478
339,977
kWh
|
$4,777
-
MMBtu
|
$4,326 | ||
| TOTAL IMPLEMENTED | $23,055 | $9,447 |
$23,386
260,844
kWh
|
- | $(-331.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs