| Assessment Year | 2016 |
|---|---|
| Principal Product | Processed beef, poultry, and pork |
| NAICS | 311611: Animal (except Poultry) Slaughtering |
| SIC | 2011: Meat Packing Plants |
| Sales Range | greater than $500 M |
| # of Employees | 1,000 |
| Plant Area |
328,000
ft2
|
| Annual Production | 250,000,000
units
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,553,645 | 39,837,047 |
kWh
|
$0.039 |
| Electricity Demand | $1,316,560 | 75,275 |
kW-mo/yr
|
$17.49 |
| Natural Gas | $515,881 | 88,218 |
MMBtu
|
$5.85 |
| TOTAL YEARLY COSTS | $3,386,086 | |||
| RECOMMENDED SAVINGS* | $303,038 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,579 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $48,548 | $62,561 |
$29,607
759,142
kWh
|
$18,942
-
kW-mo/yr
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,244 | $12,740 |
$4,244
108,808
kWh
|
- | - | - | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $26,114 | $42,500 | - | - | - |
$26,114
-
MMBtu
|
|
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,904 | $3,000 | - | - | - |
$8,904
-
MMBtu
|
|
| 05 | 2.7224: Reduce space conditioning during non-working hours | $5,675 | $2,816 |
$1,171
30,015
kWh
|
- | - |
$4,505
-
MMBtu
|
|
| 06 | 2.7241: Install outside air damper / economizer on hvac unit | $1,980 | $7,000 |
$1,980
50,777
kWh
|
- | - | - | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $17,684 | $1,972 |
$10,286
263,734
kWh
|
$7,398
-
kW-mo/yr
|
- | - | |
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $14,014 | $4,000 |
$14,014
359,322
kWh
|
- | - | - | |
| 09 | 2.6231: Utilize controls to operate equipment only when needed | $159,843 | $40,000 |
$159,843
4,098,545
kWh
|
- | - | - | |
| 10 | 2.3132: Recharge batteries on during off-peak demand periods | $13,152 | - | - | - | $13,152 | - | |
| 11 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,880 | - |
$2,880
73,854
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $303,038 | $176,589 |
$224,024
5,744,197
kWh
|
$26,340
-
kW-mo/yr
|
$13,152 |
$39,523
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $14,579 | $5,816 |
$1,171
30,015
kWh
|
- | - |
$13,409
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs