ITAC Assessment: OK0947
ITAC logo
ITAC Assessment: OK0947
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product PE Pipes
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 98,000
ft2
Annual Production 4,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $303,877 6,898,732
kWh
Electricity Demand $130,091 21,816
kW-mo/yr
Natural Gas $13,233 4,134
MMBtu
Waste Disposal Costs
Water Usage $12,433 3,506
Tgal
Water Disposal $17,611 1,754
Tgal
TOTAL YEARLY COSTS $477,245
RECOMMENDED SAVINGS* $39,773 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2622: Replace existing chiller with high efficiency model $11,871 $92,000 $11,871
269,808
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $985 $3,780 $985
22,386
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,495 $9,720 $2,023
45,984
kWh
$472
-
kW-mo/yr
- -
04 2.2511: Insulate bare equipment $11,683 $10,036 $11,683
265,521
kWh
- - -
05 2.7231: Use radiant heater for spot heating $3,754 $19,570 - - - $3,754
-
MMBtu
06 2.6232: Install set-back timers $483 $410 $393
8,935
kWh
- - $90
-
MMBtu
07 2.3212: Optimize plant power factor $4,680 $27,500 - - $4,680 -
08 2.4221: Install compressor air intakes in coolest locations $368 $822 $368
8,379
kWh
- - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,092 $2,000 $3,092
70,295
kWh
- - -
10 2.6218: Turn off equipment when not in use $362 $540 $362
8,236
kWh
- - -
TOTAL RECOMMENDED $39,773 $166,378 $30,777
699,544
kWh
$472
-
kW-mo/yr
$4,680 $3,844
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs