ITAC Assessment: OK0943
ITAC logo
ITAC Assessment: OK0943
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Corrugated boxes, shipping supplies, bottled water, pressed paper produc
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 307,000
ft2
Annual Production 13,300,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,209 3,672,480
kWh
Electricity Demand $149,826 12,583
kW-mo/yr
Electricity Fees $16,679 -
Natural Gas $129,692 28,646
MMBtu
Waste Disposal Costs
Water Usage $89,773 18,462
Tgal
Water Disposal $46,620 18,462
Tgal
TOTAL YEARLY COSTS $564,799
RECOMMENDED SAVINGS* $102,576 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $94,200

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 3.4116: Meter recycled water (to reduce sewer charges) $40,741 $19,000 - - - - $40,741
-
Tgal
02 2.8123: Pay utility bills on time $21,826 - - - $21,826 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,211 - $7,211
225,307
kWh
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,792 $250 $4,792
133,117
kWh
- - - -
05 2.4322: Use or replace with energy efficient substitutes $3,584 $1,350 $3,584
99,558
kWh
- - - -
06 2.4221: Install compressor air intakes in coolest locations $645 $1,405 $645
17,920
kWh
- - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,445 $11,700 $7,445
206,801
kWh
- - - -
08 2.1131: Repair faulty insulation in furnaces, boilers, etc $5,953 $4,600 - - - $5,953
-
MMBtu
-
09 2.7241: Install outside air damper / economizer on hvac unit $1,934 $2,720 $1,934
53,718
kWh
- - - -
10 2.6232: Install set-back timers $1,250 $790 $281
7,801
kWh
- - $969
-
MMBtu
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $6,334 $21,372 $4,119
114,409
kWh
$2,215
-
kW-mo/yr
- - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $861 $4,032 $389
10,816
kWh
$472
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $102,576 $67,219 $30,400
869,447
kWh
$2,687
-
kW-mo/yr
$21,826 $6,922
-
MMBtu
$40,741
-
Tgal
TOTAL IMPLEMENTED $94,200 $65,619 $22,024
636,772
kWh
$2,687
-
kW-mo/yr
$21,826 $6,922
-
MMBtu
$40,741
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings