Assessment Year | 2015 |
---|---|
Principal Product | Asphalt based roof coatings |
NAICS | 324122: Asphalt Shingle and Coating Materials Manufacturing |
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $1 M to 5M |
# of Employees | 32 |
Plant Area |
106,500
ft2
|
Annual Production | 8,065
Tgal
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Texas |
View Case Study |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $85,967 | 657,274 |
kWh
|
$0.13 |
Natural Gas | $134,252 | 42,078 |
MMBtu
|
$3.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,266 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,346 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $758 | $1,688 |
$758
5,783
kWh
|
- | |
02 | 2.7134: Use photocell controls | $2,030 | $1,790 |
$2,030
15,494
kWh
|
- | |
03 | 2.7135: Install occupancy sensors | $815 | $3,390 |
$815
6,220
kWh
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,498 | $3,000 | - |
$4,498
-
MMBtu
|
|
05 | 2.1224: Replace boiler | $10,468 | $22,000 | - |
$10,468
-
MMBtu
|
|
06 | 2.2135: Repair and eliminate steam leaks | $435 | $600 | - |
$435
-
MMBtu
|
|
07 | 2.2437: Recover waste heat from equipment | $4,213 | $6,000 | - |
$4,213
-
MMBtu
|
|
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,725 | $2,000 | - |
$2,725
-
MMBtu
|
|
09 | 2.2136: Install / repair insulation on steam lines | $3,124 | $5,120 | - |
$3,124
-
MMBtu
|
|
10 | 2.6232: Install set-back timers | $1,991 | $100 |
$1,583
12,086
kWh
|
$408
-
MMBtu
|
|
11 | 2.6218: Turn off equipment when not in use | $208 | $210 |
$208
1,591
kWh
|
- | |
TOTAL RECOMMENDED | $31,266 | $45,898 |
$5,394
41,174
kWh
|
$25,872
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,346 | $15,898 |
$3,156
24,089
kWh
|
$11,190
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs