| Assessment Year | 2015 |
|---|---|
| Principal Product | Stamped gaskets, fabricated parts, and hoses |
| NAICS | 326220: Rubber and Plastics Hoses and Belting Manufacturing |
| SIC | 3052: Rubber and Plastics Hose and Belting |
| Sales Range | $10 M to 50M |
| # of Employees | 65 |
| Plant Area |
35,500
ft2
|
| Annual Production | 50,000
ton
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $53,801 | 547,230 |
kWh
|
$0.098 |
| Electricity Demand | $9,526 | 1,787 |
kW-mo/yr
|
$5.33 |
| Natural Gas | $39,125 | 4,559 |
MMBtu
|
$8.58 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $27,044 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,205 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7135: Install occupancy sensors | $6,606 | $2,673 |
$6,606
64,087
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,311 | $1,578 |
$1,135
11,544
kWh
|
$176
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,931 | $23,184 | - | - |
$10,931
-
MMBtu
|
|
| 04 | 2.7261: Install timers and/or thermostats | $3,806 | $1,000 |
$1,738
17,678
kWh
|
- |
$2,068
-
MMBtu
|
|
| 05 | 2.7241: Install outside air damper / economizer on hvac unit | $2,525 | $9,000 |
$2,525
25,687
kWh
|
- | - | |
| 06 | 2.4224: Upgrade controls on compressors | $1,330 | $85 |
$1,330
13,532
kWh
|
- | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $399 | $133 |
$399
4,060
kWh
|
- | - | |
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $137 | - |
$137
1,397
kWh
|
- | - | |
| TOTAL RECOMMENDED | $27,044 | $37,653 |
$13,870
137,985
kWh
|
$176
-
kW-mo/yr
|
$12,999
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $4,205 | $1,133 |
$2,137
21,738
kWh
|
- |
$2,068
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs