ITAC Assessment: OK0907
ITAC logo
ITAC Assessment: OK0907
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Soft drink manufacturing
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 57
Plant Area 250,000
ft2
Annual Production 15,500,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $347,916 5,750,400
kWh
Electricity Demand $220,060 18,067
kW-mo/yr
Natural Gas $147,761 24,227
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,716 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,795

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $1,237 $706 $1,237
20,446
kWh
- - -
02 2.7135: Install occupancy sensors $1,302 $332 $1,302
21,518
kWh
- - -
03 2.7141: Lower light fixtures in high ceiling areas $20,444 $1,413 $15,872
262,349
kWh
$4,572
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,869 $9,983 $3,869
63,952
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,448 $1,250 $4,448
73,518
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $1,388 $503 $1,388
22,936
kWh
- - -
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,403 $800 - - - $1,403
-
MMBtu
08 2.2437: Recover waste heat from equipment $29,042 $30,000 - - - $29,042
-
MMBtu
09 2.1121: Use insulation in furnaces to facilitate heating / cooling $2,429 $960 - - - $2,429
-
MMBtu
10 2.7261: Install timers and/or thermostats $3,915 $2,750 $1,170
19,344
kWh
- - $2,745
-
MMBtu
11 2.3132: Recharge batteries on during off-peak demand periods $2,466 - - $2,466
-
kW-mo/yr
- -
12 2.4131: Size electric motors for peak operating efficiency $1,510 $3,052 $1,510
24,954
kWh
- - -
13 2.3212: Optimize plant power factor $11,263 $25,597 - - $11,263 -
TOTAL RECOMMENDED $84,716 $77,346 $30,796
509,017
kWh
$7,038
-
kW-mo/yr
$11,263 $35,619
-
MMBtu
TOTAL IMPLEMENTED $14,795 $7,100 $8,497
140,436
kWh
$2,466
-
kW-mo/yr
- $3,832
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs