ITAC Assessment: OK0594
ITAC logo
ITAC Assessment: OK0594
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Metal Cutting Band Saw
NAICS
n/a
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $5
M
to 10
M
# of Employees 310
Plant Area 140,000
ft2
Annual Production 720
pieces
Production Hrs. Annual 6,552
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,145 2,351,700
kWh
Electricity Demand $58,501 -
Natural Gas $20,966 5,039
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $263,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,870

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,935 $800 $9,364
520,223
kWh
$571
-
kW-mo/yr
- - -
02 2.7232: Replace existing hvac unit with high efficiency model $8,177 $13,490 - - $8,177
-
MMBtu
- -
03 2.7145: Install skylights $3,419 $2,000 $1,041
57,737
kWh
$2,378
-
kW-mo/yr
- - -
04 4.446: Automate finishing process $137,280 $200,000 - - - - $137,280
05 2.7135: Install occupancy sensors $3,339 $860 $2,098
33,705
kWh
$2,053
-
kW-mo/yr
$(-812.0)
-
MMBtu
- -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $1,028 - - - - $1,028
-
lb
-
07 2.7141: Lower light fixtures in high ceiling areas $81,900 $11,250 - - - - $81,900
08 2.7111: Reduce illumination to minimum necessary levels $10,512 $561 $5,556
235,346
kWh
$4,956
-
kW-mo/yr
- - -
09 4.425: Eliminate/reduce redundant inspections $8,320 - - - - - $8,320
TOTAL RECOMMENDED $263,910 $228,961 $18,059
847,011
kWh
$9,958
-
kW-mo/yr
$7,365
-
MMBtu
$1,028
-
lb
$227,500
TOTAL IMPLEMENTED $24,870 $17,150 $12,503
611,665
kWh
$5,002
-
kW-mo/yr
$7,365
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs