| Assessment Year | 2023 |
|---|---|
| Principal Product | Appliance Metal Hardware |
| NAICS | 332510: Hardware Manufacturing |
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 326 |
| Plant Area |
180,000
ft2
|
| Annual Production | 18,000,000
pieces
|
| Production Hrs. Annual | 5,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $512,825 | 5,125,355 |
kWh
|
$0.10 | |
| Natural Gas | $139,221 | 25,229 |
MMBtu
|
$5.52 | |
| Waste Disposal Costs | |||||
| Water Usage | $37,730 | 3,499 |
Tgal
|
$10.78 | |
| Water Disposal | $34,068 | 3,499 |
Tgal
|
$9.74 | |
| TOTAL YEARLY COSTS | $723,844 | ||||
| RECOMMENDED SAVINGS* | $209,940 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $110,725 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8121: Apply for tax-free status for energy purchases | $24,875 | $1,600 | - | - | $6,219 | $18,656 | |
| 02 | 2.8123: Pay utility bills on time | $593 | - | - | - | $593 | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,552 | $5,960 |
$12,552
125,515
kWh
|
- | - | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,315 | $60 |
$4,315
43,146
kWh
|
- | - | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,610 | $1,085 |
$2,610
26,100
kWh
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,163 | $34,256 |
$5,600
56,000
kWh
|
- | $2,563 | - | |
| 07 | 2.9114: Use solar heat to make electricty | $77,094 | $526,518 |
$77,094
770,943
kWh
|
- | - | - | |
| 08 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $79,738 | $627,000 |
$100,000
1,000,000
kWh
|
$(-13,862.0)
-
MMBtu
|
$(-6,400.0) | - | |
| TOTAL RECOMMENDED | $209,940 | $1,196,479 |
$202,171
2,021,704
kWh
|
$(-13,862.0)
-
MMBtu
|
$2,975 | $18,656 | ||
| TOTAL IMPLEMENTED | $110,725 | $562,374 |
$82,694
826,943
kWh
|
- | $9,375 | $18,656 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs