ITAC Assessment: AM0242
ITAC logo
ITAC Assessment: AM0242
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Semi-finished and finished truck trailer stock
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $10
M
to 50
M
# of Employees 47
Plant Area
n/a
Annual Production 6,000
thousand feet
Production Hrs. Annual 2,040
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,714 1,054,513
kWh
Natural Gas $40,999 18,218
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,576 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,576

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,440 $4,020 $7,440
71,512
kWh
-
02 2.7124: Make a practice of turning off lights when not needed $630 - $630
24,326
kWh
-
03 2.6212: Turn off equipment during breaks, reduce operating time $330 - $330
12,603
kWh
-
04 2.2511: Insulate bare equipment $100 $25 - $100
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $76 $100 $76
2,931
kWh
-
TOTAL RECOMMENDED $8,576 $4,145 $8,476
111,372
kWh
$100
-
MMBtu
TOTAL IMPLEMENTED $8,576 $4,145 $8,476
111,372
kWh
$100
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs