ITAC Assessment: OK0901
ITAC logo
ITAC Assessment: OK0901
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Gas Plant and Gas Processing Equipments
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 100,000
ft2
Annual Production 761
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,947 3,709,385
kWh
Electricity Demand $52,184 13,443
kW-mo/yr
Natural Gas $134,272 20,228
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,677 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $1,026 $1,766 $1,026
15,375
kWh
- -
02 2.2437: Recover waste heat from equipment $3,047 $1,378 - - $3,047
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,102 $1,890 $2,102
31,519
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,328 $24,267 $4,602
69,001
kWh
$726
-
kW-mo/yr
-
05 2.7261: Install timers and/or thermostats $156 $606 $95
1,427
kWh
- $61
-
MMBtu
06 2.4322: Use or replace with energy efficient substitutes $40,018 $156,997 $34,384
515,497
kWh
$5,634
-
kW-mo/yr
-
TOTAL RECOMMENDED $51,677 $186,904 $42,209
632,819
kWh
$6,360
-
kW-mo/yr
$3,108
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs