Assessment Year | 2014 |
---|---|
Principal Product | Gas Plant and Gas Processing Equipments |
NAICS | 333132: Oil and Gas Field Machinery and Equipment Manufacturing |
SIC | 3533: Oil and Gas Field Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
100,000
ft2
|
Annual Production | 761
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $247,947 | 3,709,385 |
kWh
|
$0.067 |
Electricity Demand | $52,184 | 13,443 |
kW-mo/yr
|
$3.88 |
Natural Gas | $134,272 | 20,228 |
MMBtu
|
$6.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,677 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $1,026 | $1,766 |
$1,026
15,375
kWh
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $3,047 | $1,378 | - | - |
$3,047
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,102 | $1,890 |
$2,102
31,519
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,328 | $24,267 |
$4,602
69,001
kWh
|
$726
-
kW-mo/yr
|
- | |
05 | 2.7261: Install timers and/or thermostats | $156 | $606 |
$95
1,427
kWh
|
- |
$61
-
MMBtu
|
|
06 | 2.4322: Use or replace with energy efficient substitutes | $40,018 | $156,997 |
$34,384
515,497
kWh
|
$5,634
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $51,677 | $186,904 |
$42,209
632,819
kWh
|
$6,360
-
kW-mo/yr
|
$3,108
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs