Assessment Year | 2014 |
---|---|
Principal Product | Aviation fuel filters |
NAICS | 333999: All Other Miscellaneous General Purpose Machinery Manufacturing |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
72,000
ft2
|
Annual Production | 700,000
pieces
|
Production Hrs. Annual | 4,810
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $193,406 | 2,406,160 |
kWh
|
$0.080 |
Electricity Demand | $18,673 | 8,566 |
kW-mo/yr
|
$2.18 |
Natural Gas | $181,984 | 25,221 |
MMBtu
|
$7.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $45,605 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,101 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $1,242 | $1,588 |
$1,242
15,527
kWh
|
- | |
02 | 2.2437: Recover waste heat from equipment | $6,653 | $1,751 | - |
$6,653
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,702 | $400 |
$2,702
33,772
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,435 | $16,592 |
$3,435
42,935
kWh
|
- | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $9,020 | $43,252 |
$9,020
112,752
kWh
|
- | |
06 | 2.7241: Install outside air damper / economizer on hvac unit | $13,523 | $7,700 |
$13,523
169,042
kWh
|
- | |
07 | 2.7261: Install timers and/or thermostats | $746 | $169 |
$645
8,059
kWh
|
$101
-
MMBtu
|
|
08 | 2.2414: Use waste heat from hot flue gases to preheat | $6,458 | $28,800 | - |
$6,458
-
MMBtu
|
|
09 | 2.2414: Use waste heat from hot flue gases to preheat | $1,826 | $9,200 | - |
$1,826
-
MMBtu
|
|
TOTAL RECOMMENDED | $45,605 | $109,452 |
$30,567
382,087
kWh
|
$15,038
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,101 | $2,320 |
$3,347
41,831
kWh
|
$6,754
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs