ITAC Assessment: OK0887
ITAC logo
ITAC Assessment: OK0887
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Aircraft Parts
NAICS 336411: Aircraft Manufacturing
SIC 3721: Aircraft
Sales Range $100
M
to 500
M
# of Employees 115
Plant Area 77,860
ft2
Annual Production 28,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,385 3,522,600
kWh
Electricity Demand $66,383 6,006
kW-mo/yr
Natural Gas $20,148 2,960
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,604

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $36,397 $35,374 $30,148
569,908
kWh
$6,249
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $7,219 $3,969 $7,219
136,459
kWh
- -
03 2.7141: Lower light fixtures in high ceiling areas $8,717 $3,613 $6,775
128,071
kWh
$1,942
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $1,814 $8,926 $1,814
34,286
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,474 $11,975 $3,474
65,667
kWh
- -
06 2.7261: Install timers and/or thermostats $13,990 - $6,036
114,097
kWh
- $7,954
-
MMBtu
07 2.3132: Recharge batteries on during off-peak demand periods $1,993 - - $1,993
-
kW-mo/yr
-
TOTAL RECOMMENDED $73,604 $63,857 $55,466
1,048,488
kWh
$10,184
-
kW-mo/yr
$7,954
-
MMBtu
TOTAL IMPLEMENTED $73,604 $63,857 $55,466
1,048,488
kWh
$10,184
-
kW-mo/yr
$7,954
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs