ITAC Assessment: OK0868
ITAC logo
ITAC Assessment: OK0868
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product radiation detection and measurement devices
NAICS 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $50
M
to 100
M
# of Employees 420
Plant Area 278,271
ft2
Annual Production 700,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $577,856 5,776,937
kWh
Electricity Demand $94,107 21,072
kW-mo/yr
Natural Gas $3,573 430
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,577 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,946

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,347 $750 $9,347
93,465
kWh
- -
02 2.2437: Recover waste heat from equipment $19,626 $14,640 $19,626
196,262
kWh
- -
03 2.4322: Use or replace with energy efficient substitutes $7,572 $7,700 $7,572
75,722
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $1,792 $1,851 $1,792
17,923
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,424 $2,973 $1,424
14,244
kWh
- -
06 2.6232: Install set-back timers $3,871 $606 $3,774
37,740
kWh
$97
-
kW-mo/yr
-
07 2.7211: Clean and maintain refrigerant condensers and towers $7,022 $1,140 $5,949
59,488
kWh
$1,073
-
kW-mo/yr
-
08 2.2136: Install / repair insulation on steam lines $5,338 $305 $5,338
53,382
kWh
- -
09 2.7491: Insulate glazing, walls, ceilings, and roofs $287 $456 $287
2,872
kWh
- -
10 2.7135: Install occupancy sensors $915 $4,669 $915
9,149
kWh
- -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $2,457 $13,371 $2,119
21,193
kWh
$338
-
kW-mo/yr
-
12 2.7142: Utilize higher efficiency lamps and/or ballasts $1,328 $7,958 $1,328
13,284
kWh
- -
13 2.8121: Apply for tax-free status for energy purchases $33,598 - - - $33,598
TOTAL RECOMMENDED $94,577 $56,419 $59,471
594,724
kWh
$1,508
-
kW-mo/yr
$33,598
TOTAL IMPLEMENTED $65,946 $25,874 $30,840
308,403
kWh
$1,508
-
kW-mo/yr
$33,598
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs