ITAC Assessment: OK0865
ITAC logo
ITAC Assessment: OK0865
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Electric Motors
NAICS 335312: Motor and Generator Manufacturing
SIC 3621: Motors and Generators
Sales Range $100
M
to 500
M
# of Employees 438
Plant Area 220,000
ft2
Annual Production 150,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $613,771 7,924,975
kWh
Electricity Demand $56,830 26,069
kW-mo/yr
Natural Gas $58,986 8,572
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,294 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,331

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.6232: Install set-back timers $2,575 $1,530 $992
12,888
kWh
- - $1,582
-
MMBtu
02 2.7241: Install outside air damper / economizer on hvac unit $47,613 $33,780 $47,613
618,348
kWh
- - -
03 2.7211: Clean and maintain refrigerant condensers and towers $5,494 $1,776 $5,097
66,197
kWh
$397
-
kW-mo/yr
- -
04 2.7243: Improve air circulation with destratification fans / other methods $12,200 $9,900 $6,008
78,019
kWh
- - $6,192
-
MMBtu
05 2.7135: Install occupancy sensors $138 $1,771 $138
1,788
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,091 $35,380 $4,091
53,136
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,472 $1,050 $9,472
123,011
kWh
- - -
08 2.4221: Install compressor air intakes in coolest locations $2,177 $462 $2,177
28,278
kWh
- - -
09 2.2437: Recover waste heat from equipment $7,362 $1,220 - - - $7,362
-
MMBtu
10 2.4322: Use or replace with energy efficient substitutes $3,044 $3,080 $3,044
39,527
kWh
- - -
11 2.3212: Optimize plant power factor $4,129 $11,222 - - $4,129 -
TOTAL RECOMMENDED $98,294 $101,171 $78,632
1,021,192
kWh
$397
-
kW-mo/yr
$4,129 $15,136
-
MMBtu
TOTAL IMPLEMENTED $67,331 $38,598 $65,352
848,722
kWh
$397
-
kW-mo/yr
- $1,582
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs