ITAC Assessment: OK0858
ITAC logo
ITAC Assessment: OK0858
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Packaged paper towels, toilet paper, paper napkins
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2676: Sanitary Paper Products
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 323,000
ft2
Annual Production 10,500,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $276,930 5,308,800
kWh
Electricity Demand $45,831 9,605
kW-mo/yr
Natural Gas $3,992 524
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,966 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $804

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7241: Install outside air damper / economizer on hvac unit $40,042 $20,360 $40,042
770,042
kWh
- -
02 2.6232: Install set-back timers $1,493 $172 $1,393
26,781
kWh
$100
-
kW-mo/yr
-
03 2.7243: Improve air circulation with destratification fans / other methods $5,082 $19,800 $4,572
87,913
kWh
$511
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $804 $1,338 $804
15,465
kWh
- -
05 2.2628: Utilize a less expensive cooling method $32,018 $268,800 $27,251
524,058
kWh
$4,767
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $13,454 $63,252 $13,316
256,072
kWh
$138
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $24,717 $66,757 $24,573
472,565
kWh
$143
-
kW-mo/yr
-
08 2.7122: Disconnect ballasts $6,565 $3,020 $6,498
124,969
kWh
$67
-
kW-mo/yr
-
09 2.2437: Recover waste heat from equipment $2,791 $1,220 - - $2,791
-
MMBtu
TOTAL RECOMMENDED $126,966 $444,719 $118,449
2,277,865
kWh
$5,726
-
kW-mo/yr
$2,791
-
MMBtu
TOTAL IMPLEMENTED $804 $1,338 $804
15,465
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs