Assessment Year | 2013 |
---|---|
Principal Product | Piping System |
NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
SIC | 3084: Plastics Pipe |
Sales Range | $50 M to 100M |
# of Employees | 393 |
Plant Area |
312,500
ft2
|
Annual Production | 6,265,296
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $825,796 | 16,941,325 |
kWh
|
$0.049 |
Electricity Demand | $204,102 | 31,644 |
kW-mo/yr
|
$6.45 |
Natural Gas | $102,585 | 27,900 |
MMBtu
|
$3.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $148,940 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $86,707 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $14,499 | $9,900 |
$14,499
295,898
kWh
|
- | - | - | |
02 | 2.6232: Install set-back timers | $4,654 | $1,287 |
$1,478
30,158
kWh
|
- | - |
$3,176
-
MMBtu
|
|
03 | 2.7243: Improve air circulation with destratification fans / other methods | $2,588 | $9,900 |
$160
3,268
kWh
|
$32
-
kW-mo/yr
|
- |
$2,396
-
MMBtu
|
|
04 | 2.7211: Clean and maintain refrigerant condensers and towers | $8,807 | $2,070 |
$7,168
146,292
kWh
|
$1,638
-
kW-mo/yr
|
- | - | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $6,342 | $18,900 |
$4,572
93,312
kWh
|
$1,045
-
kW-mo/yr
|
- |
$725
-
MMBtu
|
|
06 | 2.7231: Use radiant heater for spot heating | $3,427 | $15,550 |
$457
9,325
kWh
|
- | - |
$2,970
-
MMBtu
|
|
07 | 2.6232: Install set-back timers | $386 | $1,600 | - | - | - |
$386
-
MMBtu
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,693 | $20,825 |
$7,894
161,109
kWh
|
$4,799
-
kW-mo/yr
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,095 | $69,580 |
$23,741
484,507
kWh
|
$2,354
-
kW-mo/yr
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,628 | $22,407 |
$2,544
51,925
kWh
|
$1,084
-
kW-mo/yr
|
- | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,455 | $8,640 |
$2,926
59,708
kWh
|
$529
-
kW-mo/yr
|
- | - | |
12 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,606 | $3,000 |
$9,606
196,049
kWh
|
- | - | - | |
13 | 2.4221: Install compressor air intakes in coolest locations | $2,337 | $2,676 |
$2,337
47,686
kWh
|
- | - | - | |
14 | 2.4322: Use or replace with energy efficient substitutes | $4,571 | $3,850 |
$4,571
93,280
kWh
|
- | - | - | |
15 | 2.2437: Recover waste heat from equipment | $1,950 | $1,220 | - | - | - |
$1,950
-
MMBtu
|
|
16 | 2.2414: Use waste heat from hot flue gases to preheat | $12,059 | $54,000 | - | - | - |
$12,059
-
MMBtu
|
|
17 | 2.2511: Insulate bare equipment | $7,673 | $1,199 | - | - | - |
$7,673
-
MMBtu
|
|
18 | 2.2511: Insulate bare equipment | $258 | $960 | - | - | - |
$258
-
MMBtu
|
|
19 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,292 | $6,796 |
$4,292
87,600
kWh
|
- | - | - | |
20 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,823 | $3,063 |
$1,823
37,211
kWh
|
- | - | - | |
21 | 2.3212: Optimize plant power factor | $17,798 | $13,508 | - | - | $17,798 | - | |
TOTAL RECOMMENDED | $148,940 | $270,931 |
$88,069
1,797,328
kWh
|
$11,481
-
kW-mo/yr
|
$17,798 |
$31,592
-
MMBtu
|
||
TOTAL IMPLEMENTED | $86,707 | $148,227 |
$52,888
1,079,365
kWh
|
$9,875
-
kW-mo/yr
|
$17,798 |
$6,146
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs