Assessment Year | 1997 |
---|---|
Principal Product | Books |
NAICS |
n/a
|
SIC | 2730: |
Sales Range | $50 M to 100M |
# of Employees | 148 |
Plant Area |
384,000
ft2
|
Annual Production | 95,700,000
pieces
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $52,816 | 2,833,529 |
kWh
|
$0.019 |
Electricity Demand | $69,587 | 6,359 |
kW-mo/yr
|
$10.94 |
Electricity Fees | $6,120 | - |
|
- |
Natural Gas | $37,947 | 7,567 |
MMBtu
|
$5.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $179,433 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $174,985 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $2,216 | $3,300 | - |
$2,216
-
kW-mo/yr
|
- | - | - | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $355 | $715 |
$143
3,517
kWh
|
$194
-
kW-mo/yr
|
$18 | - | - | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $54 | $1,125 |
$21
1,172
kWh
|
$30
-
kW-mo/yr
|
$3 | - | - | - | - | - | |
04 | 2.7135: Install occupancy sensors | $97 | $400 |
$97
5,275
kWh
|
- | - | - | - | - | - | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $1,271 | $688 |
$509
27,843
kWh
|
$699
-
kW-mo/yr
|
$63 | - | - | - | - | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $1,873 | $1,155 |
$751
41,032
kWh
|
$1,029
-
kW-mo/yr
|
$93 | - | - | - | - | - | |
07 | 4.322: Eliminate old stock and modify inventory control | $116,808 | $15,230 |
$4,559
222,743
kWh
|
$5,577
-
kW-mo/yr
|
- | - | - | $(-13,328.0) | - | $120,000 | |
08 | 4.322: Eliminate old stock and modify inventory control | $51,750 | $3,780 | - | - | - | - | - | - | $6,750 | $45,000 | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $82 | $395 | - | - | - |
$82
-
MMBtu
|
- | - | - | - | |
10 | 2.4221: Install compressor air intakes in coolest locations | $82 | $350 |
$82
4,396
kWh
|
- | - | - | - | - | - | - | |
11 | 2.4133: Use most efficient type of electric motors | $4,719 | $5,060 |
$1,889
103,751
kWh
|
$2,605
-
kW-mo/yr
|
$225 | - | - | - | - | - | |
12 | 3.5316: Contract a wood pallet recycling company | $126 | - | - | - | - | - |
$126
-
lb
|
- | - | - | |
TOTAL RECOMMENDED | $179,433 | $32,198 |
$8,051
409,729
kWh
|
$12,350
-
kW-mo/yr
|
$402 |
$82
-
MMBtu
|
$126
-
lb
|
$(-13,328.0) | $6,750 | $165,000 | ||
TOTAL IMPLEMENTED | $174,985 | $25,868 |
$7,100
357,854
kWh
|
$9,075
-
kW-mo/yr
|
$306 |
$82
-
MMBtu
|
- | $(-13,328.0) | $6,750 | $165,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs