Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Books
NAICS
n/a
SIC 2730:
Sales Range $50
M
to 100
M
# of Employees 148
Plant Area 384,000
ft2
Annual Production 95,700,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,816 2,833,529
kWh
Electricity Demand $69,587 6,359
kW-mo/yr
Electricity Fees $6,120 -
Natural Gas $37,947 7,567
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $179,433 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $174,985

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 2.3212: Optimize plant power factor $2,216 $3,300 - $2,216
-
kW-mo/yr
- - - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $355 $715 $143
3,517
kWh
$194
-
kW-mo/yr
$18 - - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $54 $1,125 $21
1,172
kWh
$30
-
kW-mo/yr
$3 - - - - -
04 2.7135: Install occupancy sensors $97 $400 $97
5,275
kWh
- - - - - - -
05 2.7111: Reduce illumination to minimum necessary levels $1,271 $688 $509
27,843
kWh
$699
-
kW-mo/yr
$63 - - - - -
06 2.7111: Reduce illumination to minimum necessary levels $1,873 $1,155 $751
41,032
kWh
$1,029
-
kW-mo/yr
$93 - - - - -
07 4.322: Eliminate old stock and modify inventory control $116,808 $15,230 $4,559
222,743
kWh
$5,577
-
kW-mo/yr
- - - $(-13,328.0) - $120,000
08 4.322: Eliminate old stock and modify inventory control $51,750 $3,780 - - - - - - $6,750 $45,000
09 2.7447: Install vinyl strip / high speed / air curtain doors $82 $395 - - - $82
-
MMBtu
- - - -
10 2.4221: Install compressor air intakes in coolest locations $82 $350 $82
4,396
kWh
- - - - - - -
11 2.4133: Use most efficient type of electric motors $4,719 $5,060 $1,889
103,751
kWh
$2,605
-
kW-mo/yr
$225 - - - - -
12 3.5316: Contract a wood pallet recycling company $126 - - - - - $126
-
lb
- - -
TOTAL RECOMMENDED $179,433 $32,198 $8,051
409,729
kWh
$12,350
-
kW-mo/yr
$402 $82
-
MMBtu
$126
-
lb
$(-13,328.0) $6,750 $165,000
TOTAL IMPLEMENTED $174,985 $25,868 $7,100
357,854
kWh
$9,075
-
kW-mo/yr
$306 $82
-
MMBtu
- $(-13,328.0) $6,750 $165,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs