ITAC Assessment: MA0380
ITAC logo
ITAC Assessment: MA0380
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Aircraft service tools,ground support equip. and manufacture
NAICS
n/a
SIC 3546: Power-Driven Handtools
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 31,000
ft2
Annual Production 52,000
pieces
Production Hrs. Annual 3,042
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,098 687,280
kWh
Electricity Demand $23,920 2,717
kW-mo/yr
Electricity Fees $3,209 -
Natural Gas $18,110 2,566
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,860 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,634

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,018 $5,000 $4,852
80,891
kWh
$(-3,634.0)
-
MMBtu
- $2,800
02 2.5115: Reposition oven walls to reduce heated space $1,037 $360 $1,037
17,292
kWh
- - -
03 2.2511: Insulate bare equipment $686 $1,040 $457
7,620
kWh
$229
-
MMBtu
- -
04 2.7224: Reduce space conditioning during non-working hours $616 $885 - $616
-
MMBtu
- -
05 3.6112: Use filter and drying oven to reduce sludge volume $503 $229 $(-47.0)
(-879)
kWh
- $550
-
gal
-
TOTAL RECOMMENDED $6,860 $7,514 $6,299
104,924
kWh
$(-2,789.0)
-
MMBtu
$550
-
gal
$2,800
TOTAL IMPLEMENTED $4,634 $5,885 $4,852
80,891
kWh
$(-3,018.0)
-
MMBtu
- $2,800
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs