Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Valves and Fittings
NAICS 332919: Other Metal Valve and Pipe Fitting Manufacturing
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 122,543
ft2
Annual Production 500,000
units
Production Hrs. Annual 4,550
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,994 1,289,328
kWh
Electricity Demand $23,496 2,641
kW-mo/yr
Natural Gas $33,975 4,857
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,254 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,887

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $1,621 $2,310 $1,621
21,616
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,456 - $1,456
19,415
kWh
- -
03 2.2437: Recover waste heat from equipment $2,590 $2,756 - - $2,590
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $497 $1,388 $497
6,623
kWh
- -
05 2.7241: Install outside air damper / economizer on hvac unit $1,781 $1,440 $1,781
23,741
kWh
- -
06 2.7211: Clean and maintain refrigerant condensers and towers $1,139 $344 $819
10,920
kWh
$320
-
kW-mo/yr
-
07 2.6232: Install set-back timers $1,467 $1,038 $334
4,458
kWh
- $1,132
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,138 $17,292 $2,138
28,503
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $838 $3,718 $550
7,328
kWh
$288
-
kW-mo/yr
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,935 $10,793 $1,401
18,684
kWh
$534
-
kW-mo/yr
-
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,792 $550 $4,792
63,892
kWh
- -
TOTAL RECOMMENDED $20,254 $41,629 $15,389
205,180
kWh
$1,142
-
kW-mo/yr
$3,722
-
MMBtu
TOTAL IMPLEMENTED $8,887 $8,310 $8,279
110,379
kWh
$608
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs