ITAC Assessment: IP0207
ITAC logo
ITAC Assessment: IP0207
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Gourmet popcorn, fudge, and glazed nuts
NAICS 311919: Other Snack Food Manufacturing
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range less than $500
k
# of Employees 13
Plant Area 58,309
ft2
Annual Production 14,724
lb
Production Hrs. Annual 2,030
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,921 576,737
kWh
Electricity Demand $27,808 1,673
kW-mo/yr
Electricity Fees $945 -
Natural Gas $25,688 2,863
MMBtu
Waste Disposal Costs
Water Usage $9,415 651
Tgal
Water Disposal $5,985 651
Tgal
TOTAL YEARLY COSTS $126,762
RECOMMENDED SAVINGS* $17,845 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $7,560 - $6,538
66,038
kWh
- $1,023
-
MMBtu
02 2.3212: Optimize plant power factor $7,162 $5,708 $7,162
72,348
kWh
- -
03 2.4322: Use or replace with energy efficient substitutes $184 $227 $150
1,511
kWh
$34
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $970 $1,387 $518
5,226
kWh
$451
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,969 $3,653 $989
9,986
kWh
$980
-
kW-mo/yr
-
TOTAL RECOMMENDED $17,845 $10,975 $15,356
155,109
kWh
$1,466
-
kW-mo/yr
$1,023
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs