ITAC Assessment: OK0850
ITAC logo
ITAC Assessment: OK0850
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Tubular Steel
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317: Steel Pipe and Tubes
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 120,000
ft2
Annual Production 3,000
units
Production Hrs. Annual 5,200
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,233 427,680
kWh
Electricity Demand $14,536 1,641
kW-mo/yr
Natural Gas $8,740 1,404
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,261 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,340

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4226: Use / purchase optimum sized compressor $2,313 $16,254 $1,676
31,034
kWh
$637
-
kW-mo/yr
- -
02 2.2437: Recover waste heat from equipment $500 $451 - - - $500
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $123 $307 $123
2,276
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $906 $337 $906
16,759
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,925 $14,793 $2,172
40,226
kWh
$753
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $594 $2,670 $413
7,648
kWh
$181
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $126 $654 $126
2,329
kWh
- - -
08 2.7261: Install timers and/or thermostats $2,079 $159 - - - $2,079
-
MMBtu
09 2.7232: Replace existing hvac unit with high efficiency model $434 $2,080 $402
7,441
kWh
$32
-
kW-mo/yr
- -
10 2.7232: Replace existing hvac unit with high efficiency model $212 $1,200 $212
3,931
kWh
- - -
11 2.3212: Optimize plant power factor $2,693 $11,638 - - $2,693 -
12 2.4322: Use or replace with energy efficient substitutes $4,356 $14,994 $3,160
58,519
kWh
$1,196
-
kW-mo/yr
- -
TOTAL RECOMMENDED $17,261 $65,537 $9,190
170,163
kWh
$2,799
-
kW-mo/yr
$2,693 $2,579
-
MMBtu
TOTAL IMPLEMENTED $1,340 $2,417 $1,308
24,200
kWh
$32
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs