ITAC Assessment: IA0375
ITAC logo
ITAC Assessment: IA0375
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Plastic and Composite Trim Components
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 98,000
ft2
Annual Production 2,108,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,020 5,697,260
kWh
Electricity Demand $142,729 17,148
kW-mo/yr
Electricity Fees $13,343 -
Natural Gas $137,376 13,901
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $186,602 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $170,604

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,267 $1,000 $5,385
175,967
kWh
$2,882
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,492 $40 $974
31,824
kWh
$518
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $2,641 $1,300 $1,781
58,206
kWh
$860
-
kW-mo/yr
- -
04 2.4224: Upgrade controls on compressors $3,041 $3,729 $3,041
99,403
kWh
- - -
05 2.6218: Turn off equipment when not in use $3,029 $250 $1,890
61,770
kWh
- $1,139
-
MMBtu
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $5,795 $3,729 $3,643
119,057
kWh
$2,152
-
kW-mo/yr
- -
07 4.111: Add equipment/ operators to reduce production bottleneck $162,337 $10,000 - - - $162,337
TOTAL RECOMMENDED $186,602 $20,048 $16,714
546,227
kWh
$6,412
-
kW-mo/yr
$1,139
-
MMBtu
$162,337
TOTAL IMPLEMENTED $170,604 $11,000 $5,385
175,967
kWh
$2,882
-
kW-mo/yr
- $162,337
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs