ITAC Assessment: OK0843
ITAC logo
ITAC Assessment: OK0843
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Heavy equipment attachments
NAICS 336999: All Other Transportation Equipment Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 95,545
ft2
Annual Production 25,000
pieces
Production Hrs. Annual 2,730
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,566 370,160
kWh
Electricity Demand $11,178 1,570
kW-mo/yr
Other Gas $32,966 2,801
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,995 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,575

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Gas Savings
01 2.2437: Recover waste heat from equipment $4,582 $3,116 $4,582
57,279
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,466 - $1,466
18,329
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,402 $1,000 $1,402
17,520
kWh
- -
04 2.4322: Use or replace with energy efficient substitutes $950 $1,309 $950
11,880
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $413 $875 $413
5,164
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,261 $20,748 $2,432
30,402
kWh
$829
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,864 $7,326 $1,386
17,320
kWh
$478
-
kW-mo/yr
-
08 2.7232: Replace existing hvac unit with high efficiency model $1,735 $3,900 $877
10,964
kWh
$858
-
kW-mo/yr
-
09 2.6232: Install set-back timers $709 $1,288 $709
8,858
kWh
- -
10 2.7211: Clean and maintain refrigerant condensers and towers $704 $280 $277
3,433
kWh
$427
-
kW-mo/yr
-
11 2.2414: Use waste heat from hot flue gases to preheat $4,107 $3,900 - - $4,107
-
MMBtu
12 2.2511: Insulate bare equipment $263 $768 - - $263
-
MMBtu
13 2.3212: Optimize plant power factor $3,539 $11,638 - $3,539
-
kW-mo/yr
-
TOTAL RECOMMENDED $24,995 $56,148 $14,494
181,149
kWh
$6,131
-
kW-mo/yr
$4,370
-
MMBtu
TOTAL IMPLEMENTED $12,575 $32,190 $11,268
140,850
kWh
$1,307
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs