Assessment Year | 2012 |
---|---|
Principal Product | Health care |
NAICS | 622110: General Medical and Surgical Hospitals |
SIC | 8062: General Medical and Surgical Hospitals |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
230,000
ft2
|
Annual Production | 144
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $516,606 | 9,618,032 |
kWh
|
$0.054 |
Electricity Demand | $153,117 | 16,289 |
kW-mo/yr
|
$9.40 |
Natural Gas | $112,755 | 22,090 |
MMBtu
|
$5.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $134,205 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,523 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2691: Shut off cooling if cold outside air will cool process | $65,995 | $22,579 |
$65,995
970,515
kWh
|
- | - | |
02 | 2.7211: Clean and maintain refrigerant condensers and towers | $17,278 | $4,230 |
$10,578
155,675
kWh
|
$6,700
-
kW-mo/yr
|
- | |
03 | 2.7261: Install timers and/or thermostats | $1,738 | $575 | - | - |
$1,738
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,034 | $7,088 |
$1,034
15,211
kWh
|
- | - | |
05 | 2.7135: Install occupancy sensors | $670 | $4,525 |
$670
9,855
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,402 | $2,482 |
$1,041
15,321
kWh
|
$361
-
kW-mo/yr
|
- | |
07 | 2.1224: Replace boiler | $34,401 | $192,000 | - | - |
$34,401
-
MMBtu
|
|
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,797 | $18,000 | - | - |
$8,797
-
MMBtu
|
|
09 | 2.2511: Insulate bare equipment | $678 | $1,689 | - | - |
$678
-
MMBtu
|
|
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,778 | $1,400 |
$1,778
26,140
kWh
|
- | - | |
11 | 2.4221: Install compressor air intakes in coolest locations | $434 | $1,575 |
$434
6,376
kWh
|
- | - | |
TOTAL RECOMMENDED | $134,205 | $256,143 |
$81,530
1,199,093
kWh
|
$7,061
-
kW-mo/yr
|
$45,614
-
MMBtu
|
||
TOTAL IMPLEMENTED | $28,523 | $28,155 |
$13,026
191,670
kWh
|
$6,700
-
kW-mo/yr
|
$8,797
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs