ITAC Assessment: OK0837
ITAC logo
ITAC Assessment: OK0837
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Health care
NAICS 622110: General Medical and Surgical Hospitals
SIC 8062: General Medical and Surgical Hospitals
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 230,000
ft2
Annual Production 144
units
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $516,606 9,618,032
kWh
Electricity Demand $153,117 16,289
kW-mo/yr
Natural Gas $112,755 22,090
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $134,205 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,523

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2691: Shut off cooling if cold outside air will cool process $65,995 $22,579 $65,995
970,515
kWh
- -
02 2.7211: Clean and maintain refrigerant condensers and towers $17,278 $4,230 $10,578
155,675
kWh
$6,700
-
kW-mo/yr
-
03 2.7261: Install timers and/or thermostats $1,738 $575 - - $1,738
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,034 $7,088 $1,034
15,211
kWh
- -
05 2.7135: Install occupancy sensors $670 $4,525 $670
9,855
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,402 $2,482 $1,041
15,321
kWh
$361
-
kW-mo/yr
-
07 2.1224: Replace boiler $34,401 $192,000 - - $34,401
-
MMBtu
08 2.1233: Analyze flue gas for proper air/fuel ratio $8,797 $18,000 - - $8,797
-
MMBtu
09 2.2511: Insulate bare equipment $678 $1,689 - - $678
-
MMBtu
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,778 $1,400 $1,778
26,140
kWh
- -
11 2.4221: Install compressor air intakes in coolest locations $434 $1,575 $434
6,376
kWh
- -
TOTAL RECOMMENDED $134,205 $256,143 $81,530
1,199,093
kWh
$7,061
-
kW-mo/yr
$45,614
-
MMBtu
TOTAL IMPLEMENTED $28,523 $28,155 $13,026
191,670
kWh
$6,700
-
kW-mo/yr
$8,797
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs