Assessment Year | 2012 |
---|---|
Principal Product | Poultry |
NAICS | 311615: Poultry Processing |
SIC | 2015: Poultry Slaughtering and Processing |
Sales Range | $100 M to 500M |
# of Employees | 500 |
Plant Area |
200,000
ft2
|
Annual Production | 70,000,000
lb
|
Production Hrs. Annual | 4,940
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $550,984 | 13,568,500 |
kWh
|
$0.041 |
Electricity Demand | $206,785 | 28,264 |
kW-mo/yr
|
$7.32 |
Natural Gas | $142,540 | 27,848 |
MMBtu
|
$5.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $58,310 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,860 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1113: Reduce combustion air flow to optimum | $5,700 | $5,000 | - | - |
$5,700
-
MMBtu
|
|
02 | 2.2511: Insulate bare equipment | $4,000 | $2,000 |
$800
20,000
kWh
|
$700
-
kW-mo/yr
|
$2,500
-
MMBtu
|
|
03 | 2.2511: Insulate bare equipment | $1,600 | $2,500 |
$360
9,000
kWh
|
$170
-
kW-mo/yr
|
$1,070
-
MMBtu
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $1,000 | $500 |
$1,000
25,200
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,800 | $4,050 |
$1,800
45,400
kWh
|
- | - | |
06 | 2.4322: Use or replace with energy efficient substitutes | $1,900 | $14,000 |
$1,900
46,100
kWh
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,150 | $24,000 |
$7,588
189,700
kWh
|
$2,562
-
kW-mo/yr
|
- | |
08 | 2.7263: Lower compressor pressure through a/c system modification | $31,700 | - |
$22,000
543,000
kWh
|
$9,700
-
kW-mo/yr
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $460 | $3,400 |
$460
11,400
kWh
|
- | - | |
TOTAL RECOMMENDED | $58,310 | $55,450 |
$35,908
889,800
kWh
|
$13,132
-
kW-mo/yr
|
$9,270
-
MMBtu
|
||
TOTAL IMPLEMENTED | $38,860 | $8,900 |
$23,460
579,600
kWh
|
$9,700
-
kW-mo/yr
|
$5,700
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs