ITAC Assessment: OK0833
ITAC logo
ITAC Assessment: OK0833
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Poultry
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 200,000
ft2
Annual Production 70,000,000
lb
Production Hrs. Annual 4,940
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $550,984 13,568,500
kWh
Electricity Demand $206,785 28,264
kW-mo/yr
Natural Gas $142,540 27,848
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,310 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,860

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1113: Reduce combustion air flow to optimum $5,700 $5,000 - - $5,700
-
MMBtu
02 2.2511: Insulate bare equipment $4,000 $2,000 $800
20,000
kWh
$700
-
kW-mo/yr
$2,500
-
MMBtu
03 2.2511: Insulate bare equipment $1,600 $2,500 $360
9,000
kWh
$170
-
kW-mo/yr
$1,070
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $1,000 $500 $1,000
25,200
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,800 $4,050 $1,800
45,400
kWh
- -
06 2.4322: Use or replace with energy efficient substitutes $1,900 $14,000 $1,900
46,100
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,150 $24,000 $7,588
189,700
kWh
$2,562
-
kW-mo/yr
-
08 2.7263: Lower compressor pressure through a/c system modification $31,700 - $22,000
543,000
kWh
$9,700
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $460 $3,400 $460
11,400
kWh
- -
TOTAL RECOMMENDED $58,310 $55,450 $35,908
889,800
kWh
$13,132
-
kW-mo/yr
$9,270
-
MMBtu
TOTAL IMPLEMENTED $38,860 $8,900 $23,460
579,600
kWh
$9,700
-
kW-mo/yr
$5,700
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings