Assessment Year | 2011 |
---|---|
Principal Product | Oil pumps |
NAICS | 333911: Pump and Pumping Equipment Manufacturing |
SIC | 3561: Pumps and Pumping Equipment |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
250,000
ft2
|
Annual Production | 2,500,000
pieces
|
Production Hrs. Annual | 4,368
hrs
|
Location (State) | Oklahoma |
View Case Study |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $686,572 | 10,798,000 |
kWh
|
$0.064 |
Natural Gas | $101,901 | 12,566 |
MMBtu
|
$8.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $94,458 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,282 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $34,390 | $92,072 |
$34,390
540,729
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,843 | $750 |
$1,843
28,980
kWh
|
- | |
03 | 2.7135: Install occupancy sensors | $11,401 | $77,770 |
$11,401
179,262
kWh
|
- | |
04 | 2.7135: Install occupancy sensors | $6,323 | $26,111 |
$6,323
99,423
kWh
|
- | |
05 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $13,390 | $7,255 | - |
$13,390
-
MMBtu
|
|
06 | 2.2691: Shut off cooling if cold outside air will cool process | $12,936 | $21,477 |
$12,936
203,410
kWh
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,301 | $7,605 |
$3,301
51,906
kWh
|
- | |
08 | 2.7243: Improve air circulation with destratification fans / other methods | $2,925 | $14,300 | - |
$2,925
-
MMBtu
|
|
09 | 2.7261: Install timers and/or thermostats | $801 | $353 | - |
$801
-
MMBtu
|
|
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,148 | $7,130 |
$7,148
112,390
kWh
|
- | |
TOTAL RECOMMENDED | $94,458 | $254,823 |
$77,342
1,216,100
kWh
|
$17,116
-
MMBtu
|
||
TOTAL IMPLEMENTED | $46,282 | $133,586 |
$42,556
669,132
kWh
|
$3,726
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs