Assessment Year | 2016 |
---|---|
Principal Product | Laboratory Instruments |
NAICS | 334516: Analytical Laboratory Instrument Manufacturing |
SIC | 3826: Laboratory Analytical Instruments |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
339,600
ft2
|
Annual Production | 15,000,000
units
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $84,032 | 1,809,874 |
kWh
|
$0.046 |
Electricity Demand | $85,049 | 5,327 |
kW-mo/yr
|
$15.97 |
Electricity Fees | $14,160 | - |
|
- |
Natural Gas | $40,857 | 8,021 |
MMBtu
|
$5.09 |
TOTAL YEARLY COSTS | $224,098 | |||
RECOMMENDED SAVINGS* | $15,685 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,831 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.1161: Eliminate/reduce an operation | $793 | - |
$793
17,232
kWh
|
- | - | - | - | |
02 | 2.4322: Use or replace with energy efficient substitutes | $699 | - |
$124
2,700
kWh
|
$575
-
kW-mo/yr
|
- | - | - | |
03 | 2.8123: Pay utility bills on time | $283 | - | - | - | - | - | $283 | |
04 | 3.1161: Eliminate/reduce an operation | $124 | - |
$124
2,704
kWh
|
- | - | - | - | |
05 | 3.1161: Eliminate/reduce an operation | $8,880 | $4,360 |
$(-345.0)
(-7,500)
kWh
|
$(-575.0)
-
kW-mo/yr
|
- | $5,000 | $4,800 | |
06 | 2.7314: Reduce ventilation air | $1,286 | $1,309 |
$227
4,134
kWh
|
- |
$1,059
-
MMBtu
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $493 | $691 |
$201
4,380
kWh
|
$96
-
kW-mo/yr
|
- | $155 | $41 | |
08 | 2.7135: Install occupancy sensors | $46 | $90 |
$46
999
kWh
|
- | - | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,104 | $2,253 |
$383
8,320
kWh
|
$613
-
kW-mo/yr
|
- | $170 | $(-62.0) | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $378 | $803 |
$144
3,120
kWh
|
$230
-
kW-mo/yr
|
- | $20 | $(-16.0) | |
11 | 2.6211: Conserve energy by efficient use of vending machines | $153 | $359 |
$153
3,323
kWh
|
- | - | - | - | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,446 | $6,536 |
$376
8,176
kWh
|
$1,073
-
kW-mo/yr
|
- | $5 | $(-8.0) | |
TOTAL RECOMMENDED | $15,685 | $16,401 |
$2,226
47,588
kWh
|
$2,012
-
kW-mo/yr
|
$1,059
-
MMBtu
|
$5,350 | $5,038 | ||
TOTAL IMPLEMENTED | $3,831 | $2,359 |
$1,622
34,473
kWh
|
$671
-
kW-mo/yr
|
$1,059
-
MMBtu
|
$155 | $324 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs