ITAC Assessment: SU0414
ITAC logo
ITAC Assessment: SU0414
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Laboratory Instruments
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 339,600
ft2
Annual Production 15,000,000
units
Production Hrs. Annual 2,600
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,032 1,809,874
kWh
Electricity Demand $85,049 5,327
kW-mo/yr
Electricity Fees $14,160 -
Natural Gas $40,857 8,021
MMBtu
TOTAL YEARLY COSTS $224,098
RECOMMENDED SAVINGS* $15,685 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,831

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 3.1161: Eliminate/reduce an operation $793 - $793
17,232
kWh
- - - -
02 2.4322: Use or replace with energy efficient substitutes $699 - $124
2,700
kWh
$575
-
kW-mo/yr
- - -
03 2.8123: Pay utility bills on time $283 - - - - - $283
04 3.1161: Eliminate/reduce an operation $124 - $124
2,704
kWh
- - - -
05 3.1161: Eliminate/reduce an operation $8,880 $4,360 $(-345.0)
(-7,500)
kWh
$(-575.0)
-
kW-mo/yr
- $5,000 $4,800
06 2.7314: Reduce ventilation air $1,286 $1,309 $227
4,134
kWh
- $1,059
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $493 $691 $201
4,380
kWh
$96
-
kW-mo/yr
- $155 $41
08 2.7135: Install occupancy sensors $46 $90 $46
999
kWh
- - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,104 $2,253 $383
8,320
kWh
$613
-
kW-mo/yr
- $170 $(-62.0)
10 2.7142: Utilize higher efficiency lamps and/or ballasts $378 $803 $144
3,120
kWh
$230
-
kW-mo/yr
- $20 $(-16.0)
11 2.6211: Conserve energy by efficient use of vending machines $153 $359 $153
3,323
kWh
- - - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $1,446 $6,536 $376
8,176
kWh
$1,073
-
kW-mo/yr
- $5 $(-8.0)
TOTAL RECOMMENDED $15,685 $16,401 $2,226
47,588
kWh
$2,012
-
kW-mo/yr
$1,059
-
MMBtu
$5,350 $5,038
TOTAL IMPLEMENTED $3,831 $2,359 $1,622
34,473
kWh
$671
-
kW-mo/yr
$1,059
-
MMBtu
$155 $324
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings