Assessment Year | 2011 |
---|---|
Principal Product | Plastic Gas Cans |
NAICS | 326160: Plastics Bottle Manufacturing |
SIC | 3085: Plastics Bottles |
Sales Range | $50 M to 100M |
# of Employees | 280 |
Plant Area |
600,000
ft2
|
Annual Production | 15,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $615,863 | 21,091,222 |
kWh
|
$0.029 |
Electricity Demand | $401,468 | 40,308 |
kW-mo/yr
|
$9.96 |
Natural Gas | $771 | 44 |
MMBtu
|
$17.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $153,838 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,850 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $109,231 | $57,500 |
$109,231
2,049,363
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,484 | $37,707 |
$10,484
196,704
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,177 | $38,005 |
$7,177
134,659
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,415 | $7,724 |
$1,415
26,539
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,172 | $1,600 |
$5,747
107,814
kWh
|
$(-574.7) | |
06 | 2.4221: Install compressor air intakes in coolest locations | $2,602 | $414 |
$2,602
48,793
kWh
|
- | |
07 | 2.7241: Install outside air damper / economizer on hvac unit | $8,222 | $870 |
$8,222
154,264
kWh
|
- | |
08 | 2.2511: Insulate bare equipment | $6,859 | $2,964 |
$6,859
128,687
kWh
|
- | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,676 | $7,130 |
$2,676
50,208
kWh
|
- | |
TOTAL RECOMMENDED | $153,838 | $153,914 |
$154,413
2,897,031
kWh
|
$(-574.7) | ||
TOTAL IMPLEMENTED | $26,850 | $85,450 |
$27,425
514,509
kWh
|
$(-574.7) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs