Assessment Year | 1999 |
---|---|
Principal Product | Metal Fabric and Hex Netting |
NAICS |
n/a
|
SIC | 3496: Miscellaneous Fabricated Wire Products |
Sales Range | $10 M to 50M |
# of Employees | 58 |
Plant Area |
250,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $146,706 | 2,226,260 |
kWh
|
$0.066 |
Electricity Demand | $68,684 | 9,645 |
kW-mo/yr
|
$7.12 |
Natural Gas | $151,863 | 30,834 |
MMBtu
|
$4.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $60,789 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,327 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Primary Product Savings | By-product Production Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.632: Change operating conditions | $29,415 | $130,900 |
$729
10,258
kWh
|
- | - | - | - | $11,440 | $17,246 | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,896 | $15,790 |
$4,460
62,720
kWh
|
$436
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 4.632: Change operating conditions | $2,562 | $27,140 | - | - | - | - | $2,562 | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,444 | $3,400 |
$1,444
20,223
kWh
|
- | - | - | - | - | - | |
05 | 2.2437: Recover waste heat from equipment | $3,278 | $5,204 | - | - |
$3,278
-
MMBtu
|
- | - | - | - | |
06 | 2.2437: Recover waste heat from equipment | $12,349 | $70,000 | - | - |
$12,349
-
MMBtu
|
- | - | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $709 | $1,245 |
$709
9,965
kWh
|
- | - | - | - | - | - | |
08 | 3.4151: Minimize water usage | $6,136 | $10,000 | - | - | - |
$6,136
-
Tgal
|
- | - | - | |
TOTAL RECOMMENDED | $60,789 | $263,679 |
$7,342
103,166
kWh
|
$436
-
kW-mo/yr
|
$15,627
-
MMBtu
|
$6,136
-
Tgal
|
$2,562 | $11,440 | $17,246 | ||
TOTAL IMPLEMENTED | $10,327 | $25,639 |
$6,613
92,908
kWh
|
$436
-
kW-mo/yr
|
$3,278
-
MMBtu
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Primary Product Savings | By-product Production Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs