ITAC Assessment: OK0804
ITAC logo
ITAC Assessment: OK0804
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Peanuts
NAICS 311911: Roasted Nuts and Peanut Butter Manufacturing
SIC 2068: Salted and Roasted Nuts and Seeds
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 300,000
ft2
Annual Production 80,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $659,840 8,949,746
kWh
Electricity Demand $18,325 2,080
kW-mo/yr
Natural Gas $76,105 12,042
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $670,202 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,158

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.9141: Install anaerobic digester $544,130 $5,652,880 $401,094
8,444,093
kWh
$143,035
-
kW-mo/yr
- -
02 2.2622: Replace existing chiller with high efficiency model $64,961 $238,050 $64,961
896,008
kWh
- - -
03 2.2691: Shut off cooling if cold outside air will cool process $12,835 $19,625 $12,835
177,036
kWh
- - -
04 2.6232: Install set-back timers $740 $1,625 - - - $740
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $14,796 $56,474 $14,796
204,085
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $9,996 $28,404 $9,996
137,879
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,223 $18,797 $5,223
72,037
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,244 $4,120 $1,244
17,156
kWh
- - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,362 $750 $6,362
87,754
kWh
- - -
10 2.4231: Reduce the pressure of compressed air to the minimum required $2,632 $4,325 $2,632
36,309
kWh
- - -
11 2.4239: Eliminate or reduce compressed air usage $1,295 $2,286 $1,295
17,864
kWh
- - -
12 2.4221: Install compressor air intakes in coolest locations $807 $1,843 $807
11,138
kWh
- - -
13 2.2414: Use waste heat from hot flue gases to preheat $3,107 $19,271 - - - $3,107
-
MMBtu
14 2.3212: Optimize plant power factor $2,073 $8,279 - - $2,073 -
TOTAL RECOMMENDED $670,202 $6,056,729 $521,247
10,101,359
kWh
$143,035
-
kW-mo/yr
$2,073 $3,847
-
MMBtu
TOTAL IMPLEMENTED $21,158 $57,224 $21,158
291,839
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs